Headline
- Fastening workpieces on product carriers
- Pre-treatment degreasing: serves to clean the surfaces, especially those containing grease and oil as well as water-soluble, adhesion-reducing substances
- Pre-treatment pickling: the existing natural oxide layer is removed *
- Chromium-free passivation: is used for the optimum adhesion of the powder coating, alternatively pre-anodisation for even greater corrosion protection
- Drying of the pre-treated parts in an adhesion water dryer at approx. 100°C
- Automated powder coating with manual support in difficult-to-access part geometries
- Cross-linking by melting the paint at 200 °C for up to 30 mins
- Cooling, quality control and professional packing of the coated par
*to meet the high quality requirements, several rinsing processes are integrated in the above-mentioned sequence